Compare a door-only project with a complete upgrade
If the current opener works, tell us which controls and features you want to retain. The proposal can distinguish door replacement from optional motor or accessory work. Keeping those items separate helps you see what each option changes and whether existing equipment can be retained.
Understand Boca eHub and ePlans
Boca Raton describes two systems in its permitting process: eHub handles applications, status and inspections, while ePlans is used for plan-review files and comments. Keep the project identifiers and approved documents together. Confirm first that the address is within the city’s jurisdiction, rather than relying only on a Boca Raton mailing address.
Plan the handover for every user
Make a list of remotes, keypad users and connected controls included in the work. Ask for the correct manuals and an explanation of normal operation before the visit is finished. Do not share personal passwords or access codes in the initial public service request.
Installation Questions in Boca Raton
Can I keep my existing remotes with a new installation?
That depends on whether the opener is retained and the compatibility of any replacement controls. List the devices you want to keep before choosing equipment.
Is ePlans the same as the city’s permit application system?
The city describes eHub and ePlans as separate parts of its process. Use the current instructions for the step you are completing.
